Smart Factory

Let the Manufacturing Process Become Evidence

From material inspection to final testing, six stages make the manufacturing process visible.

Let the Manufacturing Process Become Evidence
PROCESS / 01—06

From incoming material to final inspection

Organize shop-floor evidence by process so every stage remains tied to project requirements and records.

Production Equipment Overview
01 / MANUFACTURING

Production Equipment Overview

Focused on transformer coil winding equipment, this section covers high- and low-voltage coil processing capability across different product structures and the standardized way those operations are executed.

  • Automatic winding machines are mainly used for high-voltage coil winding on stacked-core transformers.
  • Horizontal winding machines are mainly used for low-voltage coil winding on stacked-core transformers.
  • Silicon-steel 3D wound-core winding machines support both high- and low-voltage coil winding for three-dimensional wound-core transformers.
  • Amorphous-alloy 3D wound-core winding machines support both high- and low-voltage coil winding for amorphous-alloy transformers.
View Details
Full-Vacuum Oil Filling System
02 / MANUFACTURING

Full-Vacuum Oil Filling System

Builds a full-vacuum oil-filling capability for transformers, reducing standing time and improving first-pass test performance.

  • Completes transformer oil filling under full-vacuum conditions to improve insulation-oil penetration.
  • Serves a critical manufacturing step after drying to ensure the quality of internal insulation treatment.
  • Applies to the manufacturing of distribution transformers and related combined substation equipment.
  • Uses a full-vacuum environment to reduce residual air, moisture, and contaminants, improving the stability of internal insulation treatment.
View Details
Intelligent Test Station
03 / MANUFACTURING

Intelligent Test Station

Uses integrated test stations and intelligent control to improve transformer final-test efficiency and operational safety.

  • Serves the comprehensive testing stage before transformer shipment and carries critical electrical performance validation tasks.
  • Supports standardized execution of testing processes through a centralized station design.
  • Forms a coordinated loop with manufacturing, quality inspection, and delivery.
  • As an important validation checkpoint before shipment, it raises the bar for test efficiency, result accuracy, and operational safety.
View Details
Key-Process Visual Inspection System
04 / MANUFACTURING

Key-Process Visual Inspection System

Strengthens shop-floor process supervision through visual recognition and alerts for critical steps, improving execution consistency in key operations.

  • Focuses on execution at critical process steps and helps managers see work status in time.
  • Monitors important steps during execution to reduce omissions and deviation.
  • Provides faster on-site feedback for manufacturing quality control.
  • Fits assembly, inspection, and operating steps in transformer manufacturing that require heightened control.
View Details
Logistics Distribution System
05 / MANUFACTURING

Logistics Distribution System

Uses AGVs and process-based material delivery to connect internal material flow, reduce waiting and shortages, and improve factory operating efficiency.

  • Supports in-plant material circulation and process delivery to keep manufacturing continuous.
  • Connects storage locations, delivery nodes, and production stations to improve on-site organization.
  • Provides support for multi-process coordination and takt stability.
  • Applies to internal delivery of coils, active parts, accessories, and auxiliary materials in transformer manufacturing.
View Details
Vacuum Radiative Drying System
06 / MANUFACTURING

Vacuum Radiative Drying System

Supports the insulation-drying stage in transformer manufacturing by improving drying efficiency, reducing energy consumption, and protecting downstream oil filling and assembly quality.

  • Used for drying and setting transformer coils and active parts after assembly, reducing the risk of moisture in insulation materials.
  • Provides stable temperature control and process discipline for subsequent oil filling, final assembly, and factory testing.
  • Matches the production-rhythm requirements of products at different voltage classes.
  • Supports a critical insulation-treatment stage in transformer manufacturing so the active part is stable before oil filling.
View Details
NEXT / PROJECT REQUIREMENTS

Align manufacturing with project conditions

Product configuration and test requirements must be confirmed for each project.

Discuss project requirements